Green Energy Overview;
  • $326,506,000.00 spent on electricity in 2006
  • Average from all sectors of the economy spend $0.0935 per KWH Jan. 10
  • 50% of all produced electricity in the US is from Coal
  • 50% of all electricity produced in the US is lost to line and other distribution losses
  • Average mandated US green energy production by 2012 is 18%
  • Average green energy produced in 2010 is 7% Jan. 10
  • Future power needs 2010:
  • Oil up 3.5%
  • Coal up 4.5%
  • Nuclear up 1.8%
  • Hydro up 1.5%
  • Biomass up 8.1%
  • Other renewable up 7.8%




  • Research Done on BNBES Turbines vrs. Standard turbines

    Solid Works Cosmos:
    Done by Chris Regus, Master Engineering

    Pressure Gradient:
    Dale Sykes Masters Fluid Mechanics

    Ansys:
    Done by Dr. Kim PHD ME, NIU

    16% Inflow, 3” Diameter:
    Results: BNBES 4 Wing 300% more energy captured

    16% Inflow, test 12.75”:
    Chicago Water Rec. Dept.18 watt produced in 3'vertical drop

    75% Inflow, turbulent water test:
    Chicago Water Rec. Dept. 8 watt in turbulent flow

    75% Flow, 90% Perpendicular to Inflow, turbulent water test:
    Chicago Water Rec. Dept.1 watt produced

    100% Inflow, 3” Diameter
    3 Wing BNBES 2.5 N vrs. .6 N, 5 blade standard

    100% Inflow, 12.75”, 325mm Diameter Harrow Gate:
    BNBES 4 lb at 1.35 mph Standard 4 blade 2.17 lbs. At 1.54mph

    100% Inflow with Generator Open river test 3” and 12.75”:
    Otto Engineering. .500 watt At 2.2v surge
    9 Watts at 2.1mph with 4:1 ratio on 500 watt China Generator

    Open river test with genset 12.75 Otto Engineering:
    Wind Blue Generator at 6:1 ratio
    5.4 watt to 15.7watt at 2.6 surge BNBES 48 No stall. Up to 30sec. At 0, 4.6watt in serge 4 blade standard turbine.

    100% Inflow 36” (915mm) Diameter Wind tests to 45MPH:
    500watts needed second test to confirm

    100% Flow, 36” (915mm) Diameter 90% perpendicular to Inflow wind test at 30 mph:
    100rpm at 2.5:1 ratio, 80watts.

    Roof top test 36” (915mm) Diameter wind test:
    January 2010 to June 2010

    Universities U of I & NIU:
    Dr. Garcia U of I, Dr. Kim & Dr. Poulhman NIU

    USPTO and PCT Patents Pending:
    Nationalization Process stage.


    home  |   about us  |   products  |   videos  |   experiments  |   comparisons  |   sponsorships  |   contact us
    Copyright © 2011 BN Balance Energy Solutions. All Rights Reserved. Patent Pending